Home > Knowledge > Content
Contact Us

Shenzhen HB Automation Equipment Co.,Ltd

Add: HB Industrial Park,No.1 of TianYang Road 6th,Songgang,Bao'an District Shenzhen,China

Contact us: Susan Sun

Tel: +86-755-27272795(6)

Fax: +86-755-27271140

Mobile: +86-13714695527

E-mail: susan@sz-hb.net , stella@sz-hb.net

Reflow Furnace Setting steps



1. First, according to the production capacity set conveyor speed, note that the belt speed can not exceed the maximum speed of reflow soldering process (here refers to meet the preheating heating rate of ≤3℃/s, welding peak temperature and reflow time should meet the welding requirements).

2. Set the temperature for the first time.

3. In order to ensure temperature stability in the furnace, the first temperature curve test.

4. Analysis of the measured temperature curve and the design of the difference between the temperature curve, the next temperature adjustment.

5. To ensure temperature stability in the furnace and to test the SMA cooled to room temperature, the next temperature curve test.

6. Repeat (4) ~) process until the measured temperature curve is consistent with the desired temperature curve of the design.


Previous: What is crest soldering?

Next: No Information

Products List
  • +Reflow Oven
  • +Wave Soldering
  • +Curing Oven
  • +SMT Peripheral Machine
  • Contact Information
    Shenzhen HB Automation Equipment Co.,Ltd
    Tel:+86-755-27272795
    Fax:+86-755-27271140
    Address:HB Industrial Park,No.1 of TianYang Road 6th,Songgang,Bao'an District Shenzhen,China
    Website:www.smthba.com
    Follow Us
    Stay in touch with HB
    submit